ALBA 28 Residence
Development ALBA 28 Residence - Carnaxide e Queijas, Oeiras
No Available Units
Development Details
A building with an urban architecture, but at the same time, it proposes a new vision of the city, environmentally sustainable and with spaces that alternate privacy and community life. It will set a new standard of quality, space and design in the residential offer in Oeiras.
Here you can enjoy a rooftop pool with a breathtaking view over the Tagus River. It comprises magnificent 2, 3 and 4 bedroom flats with terraces and balconies, all designed with high quality materials.
It is located in a recent, contemporary and fast-growing residential area, belonging to the municipality of Oeiras.
There is an approved urbanization plan for the Carnaxide Hills, which includes a water park, leisure areas, equestrian centre, hotel unit, camping site: Urbanization Plan for the Suburban Park of Carnaxide Hills
It is located 2 km from the Alegro de Alfragide Shopping Centre and all the surrounding commercial areas, 10 km from the Oeiras ParkShopping Centre and 9 km from the Colombo Shopping Centre.
The complex has good road accesses and a wide range of possible routes, being 5 km from the IC19 (Sintra-Lisbon), 11 km from the CREL (Caxias-Alverca) motorway and 3 km from the A5 (Lisbon- Cascais). Access to several public transportations. The centre of Lisbon is 11 km away, Lisbon airport is 15 km away, Sintra town centre is 21 km away and Cascais town centre is 23 km away. In this location is 9 km from several beaches of the Cascais line.
The building is composed by 12 flats types T2, T3 and T4 distributed by 8 floors, being that the floor -4, -3, -2 and -1 are underground with parking spaces and storages. It has 2 fractions per floor, left and right facing east / west with panoramic views over the Tagus River.
- Terrace / balconies
- Photovoltaic solar panels
- Heat pump
- Double glazed windows with aluminium frames with sliding system
- Electric shutters
- HVAC system and wall air conditioning
- Fitted kitchen with built-in furniture
- Built-in wardrobe in Hall
- Built-in wardrobes in bedrooms
- Car parking space for 2 cars
- Parking space for 2 cars
- Storage room
Construction expected to finish in the third quarter of 2023.
During the course of construction, the development may, for technical or commercial reasons, undergo alterations or variations.