RMB 952
Development RMB 952 - Ramalde, Porto
Discover your new chapter in the heart of Porto.
At the crossroads of city life and tranquility, RMB 952 emerges – an exclusive residential development that redefines the concept of fine living. Located at the end of Rua Monte dos Burgos, near Amial and Estrada da Circunvalação, this project stands out for its contemporary architecture, top-quality finishes, and a harmonious connection between the urban environment and the serenity of nature.
With modern and functional solutions, RMB 952 was designed for those who value comfort, elegance, and quality of life. Here, every detail has been carefully crafted to offer a truly unique residential experience.
Finishes and High-Quality Equipment
Living Rooms and Bedrooms:
• Aluminium window frames with thermal break and double glazing.
• Solid pine wood flooring.
• Curtain and blackout tracks with electric operation.
• Doors, panels, skirting boards, and built-in wardrobes in matte white
lacquered MDF.
• Stainless steel hardware.
• Efapel Siza series switches, recessed spotlights, and video intercom.
Kitchens:
• Marble flooring and white Silestone countertop.
• LED lighting under the counter.
• Bosch appliances (or equivalent): dishwasher, hob, extractor hood, oven,
microwave, and refrigerator.
• Rodi LINE MN 807 single-lever mixer tap with pull-out shower (or equivalent).
Bathrooms:
• Marble wall cladding.
• Salgar Thais LED mirror.
• Salgar Carla vanity unit with basin.
• Wall-hung toilet with antibacterial, soft-close seat.
• Textured, non-slip shower tray.
• Ocean series chrome-finished basin and shower mixer taps.
Associated Fractions
Development Details
Prime Location
Live with proximity and easy access to:
• University Campus and Hospital de São João.
• Main roads: VCI, Via Norte, A3 and A4.
• Shopping centres such as NorteShopping and Parque Nascente.
• Foz, Matosinhos Beach, and Porto city centre.
Sales Conditions:
• Reservation: €10,000
• 20% with CPCV (Promissory Contract)
• 10% top-ups at 12, 18, and 24 months after CPCV
• Remaining 50% upon deed
• Estimated completion: December 2027