Apartment T2 for sale in Vila Nova de Gaia
Santa Marinha e São Pedro da Afurada
398 000 €
83 m²
2 Bedrooms
2
2 WC
2
NC
Description
2 bedroom apartment for sale at €374,300
Excellent opportunity to purchase the home of your dreams!
Kori Development – Next to the VL8 roundabout (future Rubi line metro station)
This is a development and construction project by Teixeira Duarte
We present KORI – Living Evolution, an innovative and intelligent residential concept, where the flexibility and customization of spaces guarantee a more efficient use of them, you can shape your home!
At KORI, it is possible to have access to a diverse set of amenities within the home, which function as a true extension of the apartment, providing an exclusive lifestyle. Such as Wine bar, gym with indoor pool, coworking room.
Living in KORI means having the opportunity to live in the center of everything and with the metro at your doorstep.
*Scheduled opening of Santa Marinha station in 2026 - Rubi metro line*
Divisions:
- Living room
- Kitchen
- Suite
- Room
- Service toilet
- Balcony
- Parking for 1 car
Goods and services within a radius of 500m (gym, supermarket, kindergarten, restaurants, pastry shops...)
Commerce integrated into the building.
Transport to your door:
- Bicycle park (direct access to the outside)
- Metro “Rotunda” at your doorstep (2026)
- Pre-installation of electrical charging stations
- Direct access to the bus station, cycle path and electric scooter park
Economy & autonomy:
- Low consumption LED lighting
- Smart energy meters
- Motion sensors (common areas)
Low environmental impact:
- Recyclable Luxury Vinyl Tile flooring
- Integration of prefabricated/offsite manufactured solutions
- High water efficiency solutions (Taps with control flow rate, double flush toilet, shut-off valves, irrigation system efficient)
High energy efficiency:
- Class A energy certificate
- Sustainable air conditioning system
- Renewable energy production (solar panels) 25% of the building's energy needs;
- Sustainable air conditioning system
- Energy production
- Renewable (solar panels) 25% of the building’s energy needs;
- Heat Pump with high energy efficiency (Heating sanitary water for each unit of electrical energy consumed provides 3 units of thermal energy)
Expected completion date of work March 2026
Do not miss this opportunity!!!
Details
Energetic details